Schedule ​

The schedule builder produces the printed-program grid: 10:00 Pig Races, Main Stage. 10:15 Wood Carver, Back 40.

The grid ​

Time down one axis, location across the other. Build a day by placing items into the grid and dragging to reorder.

Locations are your own — Main Stage, Show Ring, Back 40, Food Court, Kids' Tent.

Conflict flagging ​

Overlaps are flagged per location. Two things at once on the Main Stage is a problem; two things at once in two different places is a normal fair.

What goes on it ​

Anything the public should know is happening: entertainment acts, judging times, livestock shows, contests, the parade, the fireworks.

Publishing ​

Publish and the schedule appears on the event's public page.

Printing ​

The schedule prints in the program layout, which is what most fairs actually need — a grid somebody can fold into a pocket.

Building it ​

  • Start with the fixed points. Gate opening, judging times, the headline act, the fireworks. Everything else fills around them.
  • Watch the food court. Scheduling three things at once at noon means nobody sees any of them and the food vendors have a queue nobody leaves.
  • Publish late, print later. The schedule always changes. Publish once it is stable and send the printer the version after that.